Skip to content
‹ Back to IndustriesEngineering & Construction

Applied Digital’s Data Center Design for a 100 MW AI Factory Built from the Ground Up

Applied Digital’s five-part series explores designing an AI-first facility that can scale from 100 to 400 megawatts. The premiere episode focuses on Polaris Forge 1, a greenfield AI campus in Ellendale, North Dakota, built for liquid cooling and dense GPU clusters as rack demands evolve.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Applied Digital on MarketScale.

By Software And Technology · · Ai CampusAi WorkloadsApplied DigitalBrian Hasemann
Share

Key takeaways

01

Applied Digital built Polaris Forge 1 from scratch for AI workloads.

02

Ellendale, North Dakota, was selected for its scalable land and energy resources.

03

The facility supports liquid cooling and is designed for future scalability.

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

AI workloads are redefining the limits of data center design and infrastructure. Legacy data centers, built for traditional co-location, cannot handle the density, thermal demands, or power dynamics of accelerated computing. The AI boom has upended the data center sector, forcing a rapid shift to liquid-cooled racks as facilities pivot from sub-10kW racks to 120kW racks. According to NVIDIA’s 2025 GTC roadmap, the company is now targeting 600kW racks by the end of 2027—a dramatic escalation that demands a complete rethinking of infrastructure design. In this climate, starting fresh isn’t a luxury—it’s a requirement.

So, how do you design an AI-first facility that can scale from 100 to 400 megawatts and stay relevant as the pace of innovation accelerates?

Welcome to the first episode of Architects of Acceleration—a five-part series from Applied Digital that takes you behind the scenes of one of the most ambitious AI infrastructure projects in the U.S. In this premiere episode, host Philbert Shih, founder of Structure Research, sits down with Todd Gale, the Chief Development Officer, and Brian Hasemann, the Design Services Manager at Applied Digital, to unpack the full design strategy behind Polaris Forge 1, a greenfield AI campus in Ellendale, North Dakota. Together, they walk through the blueprint, site selection, power procurement, and thermal architecture that shaped Applied Digital’s first 100 MW AI Factory.

What You’ll Learn in This Episode:

  • Why Applied Digital Built from Scratch: A greenfield approach allowed the team to build around 1,000–1,500 watts/sq. ft. workloads and eliminate retrofitting compromises.
  • Why Rural North Dakota: Ellendale offers scalable land, renewable wind energy, free cooling climate conditions, and power pricing advantages ideal for AI workloads.
  • How It Supports AI Workloads: The facility is optimized for liquid cooling and purpose-built to host dense GPU clusters, including evolving rack-level demands.
  • How the Campus Will Scale: The site is designed to grow from 100 MW to 400 MW, with ELN03 and ELN04 incorporating lessons from the first build for even greater flexibility.

Todd Gale is a veteran data center engineer and executive with over four decades of experience designing mission-critical infrastructure at a global scale. As Chief Development Officer at Applied Digital, he leads the strategy, design, and construction of next-generation AI data centers, including the Ellendale Campus, purpose-built for GPU workloads. Previously, he held senior roles at Flexential, Equinix (formerly Terremark), and AT&T, where he pioneered innovations in low Power Usage Effectiveness (PUE) architecture, Tier IV-certified facilities, and hyperscale cooling systems.

Brian Hasemann is Director of Data Center Design at Applied Digital, where he leads the development of mission-critical infrastructure for high-density AI workloads. With a background in mechanical engineering and project management, he has overseen major design efforts and facility assessments across data centers, hospitals, and large-scale commercial properties. Before joining Applied Digital, he held engineering and commissioning roles at EBI Consulting and Shire, bringing hands-on experience in HVAC, utility systems, and CMMS optimization across complex environments.

Article written by MarketScale.

Part of this channel

Applied Digital

News, updates, and expert insights from Applied Digital.

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

SA
Software And Technology
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

Bain Capital's reported $250M minority investment values construction platform Kahua above $1B

Bain Capital's reported $250M minority investment values construction platform Kahua above $1B

Bain Capital's Tech Opportunities fund is putting a reported $250 million into Kahua at a valuation above $1 billion. The deal follows what Kahua says is $100 million in annualized revenue. The bet rests on owner-side program data, with AI features the next sign to watch for hospitals, ports and school builders.

  • 01Kahua is selling AI on the strength of the governed data owners already keep in it. That makes data quality and permissions the place to test any new AI feature it ships.

Oct 1, 2026

Element’s Charlotte lab makes tensile specimens from turbine blade roots

Element’s Charlotte lab makes tensile specimens from turbine blade roots

Element Materials Technology’s Charlotte lab wire-EDMs one-eighth-inch cylinders from the root of a turbine blade and low-stress grinds them into tensile specimens—work value stream manager Daniel Steele says he’s not aware other labs do at this size. The lab, which invested $3.2 million in 2019 according to Aerospace Manufacturing and Design, is adding creep and stress rupture frames under a lease signed in January.

  • 01The extraction know-how has a paper trail: Aerospace Manufacturing and Design reported in March 2019 that Element’s $3.2 million Charlotte investment included EDM plunge machines—and that Charlotte was the first Element lab to install them for extracting cylindrical specimen blanks.
  • 02Deloitte's November 2025 outlook put manufacturing construction spending down 7% year over year by July 2025, so a lab adding floor space and creep frames is growing inside one of the few pockets Deloitte flagged for expansion.

Sep 30, 2026

NMHC survey: 37% raised pricing on projects on hold

NMHC survey: 37% raised pricing on projects on hold

NMHC's September construction survey found 37% of respondents repriced shelved projects upward, versus 17% in June. Starts slowed too: 29% of firms started fewer projects, and a growing share saw labor and material costs outrun inflation.

  • 01Upward repricing of projects held three to six months rose from 17% of survey respondents in June to 37% in September, while downward repricing fell from 38% to 14%.

Sep 28, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Experts

SA
Software And Technology
PS
Philbert Shih

Founder

Structure Research

TG
Todd Gale

Chief Development Officer

Applied Digital

Todd Gale is a veteran data center engineer and executive with over four decades of experience designing mission-critical infrastructure at a global scale. As Chief Development Officer at Applied Digital, he leads the development of AI-centric facilities.

BH
Brian Hasemann

Design Services Manager

Applied Digital

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512