Why land costs may decide Rhode Island's sub-$300,000 modular home goal
Rhode Island Governor-elect Helena Foulkes wants modular homes selling for about $250,000 to $300,000 and a local factory to build them. Modular construction runs about $300 a square foot versus $400 to $500 stick-built, a Rhode Island builder says. Land and utility work still set the final price.
This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.
Key takeaways
At $300 a square foot, a $300,000 home price covers about 1,000 square feet of construction and nothing for land, which makes state-owned parcels as important to the plan as factory savings.
Rhode Island has no local modular plant, so builders truck modules from Pennsylvania or northern New England; any homes for sale by summer 2027 would likely come from those out-of-state factories.
The signal to watch: whether the state brings parcels with utilities within reach to its planned manufacturer pitch day, or only factory incentives.
Free workspace
Turn your Engineering & Construction expertise into content.
Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.
Three new houses in South Kingstown, R.I., got there the unusual way: built in sections in a factory, trucked in and assembled on site. They are South County Habitat for Humanity's first modular homes. Executive director Colin Penney told The Boston Globe's Christopher Gavin that the group plans 20 to 40 more over the next two and a half years, and that modular will eventually make up about 80 percent of what it builds.
Penney's reasons are operational. Prefabrication speeds up projects, lowers overhead and makes the whole process more predictable than traditional stick-built construction, he said.
Rhode Island's next governor wants the rest of the state to follow. Governor-elect Helena Buonanno Foulkes told the Globe she is aiming for homes that sell for about $250,000 to $300,000, a price she said a family earning $100,000 could afford. She has also said she hopes to see a large number of modular homes on the market by next summer, inside a broader pledge of more than 20,000 new housing units.
She casts modular as the fast piece of a slower strategy. Places like Austin and Denver focused on supply and saw housing costs come down, she said, "But that will not happen overnight." In the meantime she wants to give people "a sense of momentum," and she called modular homes "a big, important part of that component." That framing sets a two-part test: a modular program here gets judged on how fast it delivers as well as on price.
The factory half of that plan is easy to picture. The half that decides whether a $250,000 house exists is what happens on the lot before the modules show up.
A target priced at half the market
Rhode Island's housing math, late 2026
Rhode Island Association of Realtors; HousingWorks RI; Helena Buonanno Foulkes via The Boston Globe; TheGoodBuilder.com analysis of US Census Bureau data
The first two figures come from the Rhode Island Association of Realtors and an October report from HousingWorks RI. Set against them, the Foulkes target sits at roughly half the median price, by simple division, and is pitched at households earning about $30,000 less than the income HousingWorks RI says buying now requires. That is a large gap to close with one construction method.
Melina Lodge, who leads the Housing Network of Rhode Island, a coalition of groups that aim to grow and protect the supply of affordable homes, called rising construction costs "a critical piece" of the state's housing crisis. For nonprofits, she said, the stakes are simple: subsidy dollars are limited, so whatever lowers the "real cost" buys more homes with the same money.
Her qualifier is worth holding onto. A saving on the factory-built box that turns up again as site work would not be a real cost reduction. For the developers and agencies spending those dollars, the question is which cost actually falls.
What $300 a square foot buys
Dave Zoglio has run Coastal Modular Homes of Rhode Island for four decades, including recently finished homes in Charlestown, and he thinks the governor-elect is onto something. He put stick-built construction at $400 to $500 per square foot and modular at about $300 or less. That is a meaningful saving on the box itself, a quarter to 40 percent at the ends of his ranges, by arithmetic on his figures.
Now run the target through those numbers. One label first: what follows is our own back-of-envelope estimate, made by dividing Foulkes's target prices by Zoglio's per-foot construction costs. No source reported these square footages, and they should be read as an illustration of scale, not a price quote.
At $300 a square foot, the top of Zoglio's modular range, a $300,000 budget buys about 1,000 square feet of house and not one square foot of land. At $250,000, the same rate covers roughly 830 square feet. Stick-built at $400 to $500 would deliver 600 to 750 square feet for $300,000. His modular figure is a ceiling, so cheaper factory pricing would stretch these estimates. Still, the shape is clear: the target leaves little room for anything beyond construction.
Zoglio's per-square-foot figures describe building the house. Buying the land, developing the lot and connecting utilities are separate costs, and he named infrastructure as the biggest of them.
Zoglio was blunt about where the math breaks. Most of his work is in South County, where he told the Globe he doubted a piece of land could be bought for $600,000. He can put up a house at a reasonable price, he said, but developing the property comes in at market rate, and that "kind of throws the whole deal out the window."
Foulkes's answer begins with land the state already owns. She has started taking inventory of parcels that could be repurposed for housing, concentrating on the urban core, and she has said both the public and private sectors must be part of the path forward. The private side has already reached out: an owner in an unnamed town told her they have 100 acres and want to develop it with housing. She plans to visit in the coming weeks to judge whether the site could host early homes.
If those parcels already sit near water, sewer and power, they address both halves of Zoglio's warning at once. If they need new roads and utility lines, the factory savings could be spent on the ground before the first module arrives.
No modular plant in Rhode Island yet
Most of New England's prefab factories sit in Maine, New Hampshire and Vermont. Zoglio buys from a manufacturer in Pennsylvania. He said shipping is expensive and that there are really no local companies to turn to. Foulkes's housing plan calls for recruiting manufacturers to open in the state, arguing that doing so would lower shipping costs and create jobs.
She has not wavered on how to get there. On the morning after her Nov. 3 win, in which she took 57.5 percent of the vote, she told reporters she wanted to hold a day where modular companies come to talk about opening operations in Rhode Island, Edward Fitzpatrick reported for the Globe. She now calls it a pitch day within her first 100 days, a discussion of what it would take to bring a plant to the state. Her goal, she said, is for Rhode Island to be really at the epicenter of this.
Habitat is already a step into that conversation. Penney pointed to a Habitat partnership with the city of Boulder, Colo., that created a modular factory serving Habitat and other affordable housing groups, and said South County Habitat has had preliminary talks with state officials about a Rhode Island operation, something he hopes to finish over the next couple of years.
That timeline matters. A plant measured in years and a sales goal set for next summer indicate that the first homes under the Foulkes plan would come from the same out-of-state factories builders use today, with transport costs included. For a manufacturer weighing the pitch day, the useful evidence is the pipeline: Habitat's 20 to 40 units, the state's 20,000-unit goal, and how many of those units have land ready to receive them.
For a manufacturer or developer at the pitch day, the sharper question is about lots, not incentives: which state parcels are on the inventory, how close they are to utilities, and how many units a year a Rhode Island plant could count on.
Why modular has stayed at one in 100
Modular remains rare nationally. TheGoodBuilder.com, an Australia-based construction publication, analyzed US Census Bureau data and found one in every 100 new US homes built in 2025 was modular. The Northeast runs higher: 4,000 of the region's 66,000 new single-family homes were modular, about 6 percent by simple division, though the regional figure counts only single-family homes while the national one counts all new homes.
Penney sees momentum inside his own network. Five years ago, he said, a handful of Habitat affiliates nationwide used modular; now it has become a major trend for them.
Christian Belden, executive director of Church Community Housing Corporation, a Newport nonprofit that builds affordable housing, is less convinced. His group's past modular projects ran into contractors who left work unfinished, and he still has questions about the quality of a cheaper product, citing the old line "You get what you pay for." Modular is not new, he said, and it has not caught on the way it could have; maybe the product has matured, but he is not counting on it. Affordable housing advocates more broadly told the Globe that modular, whatever its potential, is only one tool for the housing crisis.
Belden's experience points at the same seam Zoglio's numbers do. Penney's case for the factory rests on speed, lower overhead and predictability. The trouble Belden described came from the on-site work, the part a factory does not control.
The site visit, then the pitch day
The first test comes within weeks, when Foulkes tours the 100-acre offer. The pitch day follows in her first 100 days, after she takes office in January, and the summer 2027 sales goal sits behind both.
Watch what the state brings to the manufacturers. Parcels with utilities within reach would give a $250,000 modular home a credible path. Factory incentives alone would leave the land and hookup bill Zoglio described exactly where it is.
Sources
Featured companies
Your experts belong here
Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.
Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.
About the author
The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.