Skip to content
‹ Back to IndustriesEngineering & Construction

Applied Digital’s Ellendale AI Data Center: Pioneering the Future of Accelerated AI Computing in North Dakota

Applied Digital's Ellendale AI Data Center in North Dakota is a cutting-edge facility designed for AI computing at scale. Spanning 363,000 square feet, it features advanced technologies like liquid cooling and is optimized for high-performance computing. The data center sets new industry standards in AI data infrastructure.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Applied Digital on MarketScale.

By Applied Digital · · Ai ComputingAi Data InfrastructureApplied DigitalEllendale Ai Data Center
Share

Key takeaways

01

Ellendale AI Data Center covers 363,000 square feet across three stories.

02

Designed for a 100MW IT load with advanced liquid cooling systems.

03

Focuses on efficiency and sustainability for accelerated AI computing.

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Applied Digital is making remarkable strides in the field of artificial intelligence, as demonstrated by the latest progress update on its Ellendale AI Data Center in North Dakota. This state-of-the-art facility embodies the perfect blend of advanced technology and strategic design, establishing a new benchmark in data infrastructure specifically designed for AI.

The Ellendale AI Data Center spans a massive 363,000 gross square feet across three stories. It is designed to handle an impressive 100MW IT load. This facility is not just another data center; it is a beacon of innovation, purpose-built to cater to the intense demands of accelerated computing that modern AI technologies require.

This facility is not just another data center; it is a beacon of innovation, purpose-built to cater to the intense demands of accelerated computing that modern AI technologies require.

One of the standout features of the Ellendale Data Center is its use of advanced liquid cooling systems. These systems, combined with the naturally cold climate of North Dakota, result in a highly efficient cooling solution that is both cost-effective and environmentally friendly. The data center's design focuses on maximizing the efficiency of resource use, which is crucial for sustainable operation at scale.

The facility's layout is meticulously planned to support high-performance computing:

Main Level: This floor houses central utilities that are crucial for robust and reliable infrastructure support. These utilities are the backbone of the data center, ensuring uninterrupted service and optimal performance.

Second and Third Floors: These floors are dedicated to data halls, each designed to support a 50MW IT load. The halls are optimized for high-performance computing environments, offering scalable and efficient compute resources that can adapt to the evolving needs of AI technologies.

The Ellendale AI Data Center is poised to set new standards in data infrastructure, further empowering the capabilities of artificial intelligence technologies. The dedication of Applied Digital to innovation and excellence in the construction of the Ellendale AI Data Center reflects its commitment to advancing the field of AI. This facility is not just a milestone for the company but also a significant contribution to the technological landscape of North Dakota and the AI community worldwide.

Part of this channel

Applied Digital

News, updates, and expert insights from Applied Digital.

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

AD
Applied Digital
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

Matt Willson makes the case for modular chip plants

Matt Willson makes the case for modular chip plants

Holland Construction’s Matt Willson argues for modular chip and battery plants. ABC’s updated 2026 workforce estimate is 349,000 net new workers.

  • 0145% of contractors say a project ran late because they couldn’t staff it, making crew availability a bid-time question for owners planning a new plant.
  • 02Once modules are fabricated, design changes generally can’t be made, pushing decisions and costs earlier in the project.

Oct 16, 2026

Jemal and DivcoWest plan 323 apartments inside a 1982 DC office building

Jemal and DivcoWest plan 323 apartments inside a 1982 DC office building

Jemal Real Estate Strategies and DivcoWest plan to convert 1255 23rd Street NW, a 342,000-square-foot Washington, D.C. office building, into about 323 apartments. Madison Realty Capital lent $40 million for acquisition and predevelopment. DivcoWest is the current owner of the property and will retain an equity interest.

  • 01About 323 apartments at 1255 23rd Street NW would come close to the nearly 350 units Jemal Real Estate Strategies has created across its Syracuse and Richmond conversions combined, in a single building.
  • 02DivcoWest is selling into the venture but keeping an equity stake alongside Jemal.

Oct 12, 2026

Why a clean-looking aerospace part can still fail a residue test

Why a clean-looking aerospace part can still fail a residue test

Element Materials Technology explains NVR and gravimetric cleanliness testing for aerospace, defense and medical parts in a webinar featuring its Hartford and Los Angeles labs. Joe Moore and Katie Legowski show how a blank analysis, a solvent rinse and a weighed filter patch turn invisible residue into a number against IEST-STD-CC1246 levels, and how AMS 2700 F changed the passivation acid default in 2018.

  • 01Nonvolatile residue testing weighs what a solvent rinse removes from a part, so a film the eye cannot see becomes a pass or fail figure against the drawing.
  • 02IEST-STD-CC1246E, the document that replaced MIL-STD-1246 in 2002, sets residue limits from 10 nanograms to 25 milligrams per 0.1 square meter, and its particle levels count down to 5 microns, far below the 100 micron width of a hair.

Oct 12, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Expert

AD
Applied Digital

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512