Skip to content
‹ Back to IndustriesEngineering & Construction

The Ripple Effects of COVID-19 in the Roofing Industry with Dave Schupmann

Like all industries, the roofing industry is feeling the effects of the COVID-19 pandemic. To discuss the impacts of the disease on the industry, both immediate and lasting, Voice of B2B Daniel Litwin was joined by SVP, Sales and Marketing for Fortis Dave Schupmann for this episode of Roof Talks, a Fortis Warranty podcast. In…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
The Ripple Effects of COVID-19 in the Roofing Industry with Dave Schupmann

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Like all industries, the roofing industry is feeling the effects of the COVID-19 pandemic.

To discuss the impacts of the disease on the industry, both immediate and lasting, Voice of B2B Daniel Litwin was joined by SVP, Sales and Marketing for Fortis Dave Schupmann for this episode of Roof Talks, a Fortis Warranty podcast.

In the immediate sense, Schupmann said the industry has been a “roller coaster” over the past several weeks.

“From climate to climate and state to state, and from contractor type and certainly customer type, I think you can probably get a different answer (about the state of the industry),” he said.

For example, businesses in the grocery and food-processing industries and similar essential operations, business is as-normal or even better, though other businesses, such as tenant-focused business and more, are feeling the effects.

Schupmann said most projects are still proceeding as planned, particularly with respect to planning meetings that can be conducted remotely.

Still, certain aspects of day-to-day operations have certainly changed.

“We’re fortunate, in one case – I think there are only four states right now in the country that don’t have construction classified as an essential workforce. … It’s difficult to meet people, so something as simple as scheduling with someone to get up onto a roof and do a roof inspection – that’s not always feasible. Or sometimes they’re saying, ‘Oh, OK, just put up a ladder and go and send some pictures.’ Just the absenteeism of a lot of people in the workforce right now has made that a challenge.”

Contractors are also fewer and farther between, and travel restrictions have slowed certain aspects of the industry.

Though the current pandemic isn’t having the directly targeted effect on resources of a natural disaster or storm event, Schupmann said the wider area being affected – literally the entire globe – could spur a fundamental change in the way the industry conducts business as operations and companies adapt.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

MIT voxel blocks let imprecise robots build load-bearing demos

MIT voxel blocks let imprecise robots build load-bearing demos

MIT visiting researcher Miana Smith’s voxel blocks are designed to absorb about 10 millimeters of placement error so low-cost robots can assemble room-scale, load-bearing demos. The first field partner is Druk Holding and Investments for a planned outdoor test tied to housing at Gelephu Mindfulness City, and Smith is targeting concrete formwork next.

  • 01Putting the accuracy in the block lets a robot miss by about 10 millimeters and still assemble load-bearing demos; that tolerance is about 100× looser than typical industrial arms (an illustrative ratio from the reported figures, not a measured claim).
  • 02Cheap robots shift the hard part into the component: the voxel approach depends on producing complex lattice blocks economically, and Smith’s focus on automating their production suggests she sees that as the key hurdle.

Nov 22, 2026

Why a modular data center's 7.5-month head start depends on grid power

Why a modular data center's 7.5-month head start depends on grid power

Prefabricated modular construction can cut a 50 MW liquid-cooled data center build in Asia Pacific from about 22 months to about 14.5, depending on the market. But grid and equipment lead times can still set go-live dates. Where power is already secured, Turner & Townsend says the time saved can convert into earlier revenue; where it isn’t, it can let owners delay construction commitment closer to energization. The tradeoff is risk shifting toward factory slots, shipping, logistics and on-site interfaces.

  • 01Where the grid date is still uncertain, a 7.5-month modular saving buys the ability to commit construction money closer to energization, not earlier revenue.
  • 02Licensed electrical work is the scarcest trade in several Asia Pacific markets, and moving it into a factory can cut that on-site requirement by close to 80%.
  • 03Before signing a fixed-price module package, test the factory slot, shipping window, duty and integration assumptions behind the ready-for-service date.

Nov 21, 2026

ArcGIS Pro's November update brings OpenRoads corridor geometry into GIS

ArcGIS Pro's November update brings OpenRoads corridor geometry into GIS

Esri's November ArcGIS Pro release brings Bentley OpenRoads Designer corridor geometry and TIN surfaces into GIS. It also lets analysts propagate Building Layer settings for more consistent setup and adds Fine, Medium and Coarse graphic detail options for Revit models.

  • 01ArcGIS Pro now reads alignments, profiles, station equations and TINs from OpenRoads Designer, letting GIS teams combine corridor design data with Revit structures and Civil 3D site work in a single map
  • 02Preparation work for BIM-to-GIS conversion moves upstream to model setup: choices about graphic detail, fields, definition queries and coordinates now land with whoever configures the design before Esri does the conversion
  • 03GeoBIM’s new “3D ArcGIS” view workflow filters Revit content at the source, and ArcGIS Enterprise 12.2 adds a pre-sync analysis report to check georeferencing and coordinate system details, flag missing information and link to resources for fixes.

Nov 21, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512