RoseWater in Bellingham

Join Joe Piccirilli, CEO of Rosewater Energy, on a video tour of Alpha Technologies in Bellingham, Washington, where Rosewater products are built. Explore the Advanced Product Group and witness the meticulous process of constructing a Rosewater HUB20. Sub-assemblies are meticulously mounted and wired into the seismic rack, forming the product’s foundation. Extensive testing follows, simulating real-life scenarios for one to two days. Once completed, the unit receives its final touches before being packed and shipped directly to your job site. This insightful video showcases the attention to detail and rigorous testing behind every Rosewater product, solidifying their reputation as the best in the industry.

Recent Episodes

Electric vehicles (EVs) are reshaping the mobility landscape, but concerns about battery safety continue to cloud consumer confidence. Despite media narratives, data confirms that EVs are less likely to catch fire than gasoline-powered vehicles. A study by the Swedish Civil Contingencies Agency found that EVs are 20 times less likely to ignite than petrol…

As energy systems become more decentralized, the complexity of managing trusted devices and other components connected to the grid continues to grow. According to the U.S. Department of Energy’s Distributed Energy Resource Interconnection Roadmap (January 2025), utilities across the country are experiencing increased interconnection requests for distributed energy resources (DERs), such as solar, battery storage,…

Surging demand from data centers, AI-driven infrastructure, and electric vehicles is straining power grids already under pressure. States like Texas are seeing especially sharp growth, with grid operators warning of capacity concerns due to accelerating industrial and residential loads. This pressure is prompting urgent conversations about how to build and adapt modern energy infrastructure to…