RoseWater in Bellingham
Join Joe Piccirilli, CEO of Rosewater Energy, on a video tour of Alpha Technologies in Bellingham, Washington, where Rosewater products are built. Explore the Advanced Product Group and witness the meticulous process of constructing a Rosewater HUB20. Sub-assemblies are meticulously mounted and wired into the seismic rack, forming the product’s foundation. Extensive testing follows, simulating real-life scenarios for one to two days. Once completed, the unit receives its final touches before being packed and shipped directly to your job site. This insightful video showcases the attention to detail and rigorous testing behind every Rosewater product, solidifying their reputation as the best in the industry.