Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

In-House Structural Analysis for Decorative Metal Panels

Decorative metal panel manufacturers are called upon, now more than ever before, to solve architectural solutions for exterior facades, screening, and overhead shade. These panels can be raw metals, made to rust, ornamental blacksmith work for artistic railings, or systems of panels designed to be installed easily and last as part of the architectural form….

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share
In-House Structural Analysis for Decorative Metal Panels

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Start free

Decorative metal panel manufacturers are called upon, now more than ever before, to solve architectural solutions for exterior facades, screening, and overhead shade. These panels can be raw metals, made to rust, ornamental blacksmith work for artistic railings, or systems of panels designed to be installed easily and last as part of the architectural form.

But whether a product is decorative or structural, the designer, contractor, and customer all need to consider how building code affects the products they might want to use in the new space.

Interior screens may only need to meet deflection standards, meaning how much the panels move when you push on them. Guardrails and pool enclosures require a maximum hole size in the panels. Overhead shade needs to consider snow loads. And cladding on the outside of a building needs to be sure to stay attached in strong winds.

The engineering required for any project can be a serious matter, where cutting corners can cause permitting delays until structural calculations are reviewed. The question then becomes, “Who is the best qualified party to provide those structural calcs?” Most commercial projects have a project engineer, who can put together the documents required for a state-licensed professional engineer to stamp the drawings, in some cases, stamping it themselves.

When reviewing all the products on a building, however, the question isn’t what each product is rated for, but rather, “What is the performance of the building, as a whole?” It’s the sum of the parts, and when a little artistic license of one thing adds to a little risk tolerance in another thing, the acceptable level of risk may outweigh the value of the aesthetics. But can’t any engineer just crunch the numbers to determine the qualifications of each decorative panel?

PARASOLEIL ENGINEER, MITCH ARTEAGA, AT TESTING FACILITY

In today’s manufacturing landscape, it is easier than ever to fabricate custom things, and decorative metal panels are no exception. The more predictable a metal panel is, the easier it is to understand its structural integrity. Solid panels are easy to engineer if the material and finish are known. Industrial “perf” and expanded metals are likewise easy panel characteristics in running its geometry through structural analysis for different weather conditions and load scenarios.

But the more unpredictable the panel is, with artistic cutouts, bends, or inconsistent perforations, the more a typical engineer is going to require “over-engineering” to take out the risk of unknowns and to avoid delays in getting on to the next job.

MAXIMUM PANEL DEFLECTION EXAGGERATED BY A FACTOR OF 5

Over-engineering means thicker panels, more structural support, more fasteners, and in the end, more dollars spent for the panel system and for installation. The way to reduce risk without increasing cost is to work with product manufacturers who have the experience (and software) to provide project guidance and structural calculations for each project, as needed.

Parasoleil has created a unique and decorative product with dependable lead-times, but their Design department staff also know that pretty things need to last, especially when it comes to architecture and public spaces. And between their project guidance that they walk clients through and the engineering built into their Project Creator software, it’s only fitting that their next step was to offer a structural calculation report, specific to their project, patterns, and panel assembly.

In-house structural analysis is not required for every project. Often, relying on a product-manufacturer’s experience for what looks best is enough. But when value-engineering for a project’s risk and cost meet the uncertainty of building code requirements and getting a certificate of occupancy, there’s no better partner than one who proves the performance of their own product with numbers.

Parasoleil is a Colorado-based manufacturer of architectural panel systems to filter light and frame space. They are the 2017 recipients of the “Advancer of the Year” award from the Colorado Advanced Manufacturer Alliance.

THE EARLY DAYS OF STRUCTURAL TESTING AT PARASOLEIL

Read more at parasoleil.com

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Engineering & Construction Insights

Packaging robots can beat labor long term on cost, PMMI argues

Packaging robots can beat labor long term on cost, PMMI argues

PMMI's Tom Egan wrote in Processing Magazine that adding packaging automation and robotics can now be justified as more cost-effective over the long term than the high cost of labor in food, beverage and CPG plants. Separately, Packaging World describes AI-enabled AMRs from ABB and Agilox that automate material movement between packaging stations. The remaining gap is adoption among smaller manufacturers.

  • 01Two reference points for infrastructure-light material movement: ABB's Flexley Mover P603 carries 1,500 kg with sub-centimeter positioning and no floor markers, and Agilox's OFL lifts 800 kg pallets on peer-to-peer fleet software with no central traffic controller, per Packaging World.
  • 02The open ground is small and mid-sized manufacturers: MTC's Mike Wilson counts tens of thousands of UK SMEs with no robotic automation at all and expects cobots to take most of that growth.
  • 03A robotics business case should include procurement, not only line labor: a June 2026 China Journal of Accounting Research study found heavy robot adopters spread buying across more suppliers, gaining resilience but losing inventory efficiency and adding transaction costs.

Sep 18, 2026

Xtellio brings telematics to jobsite tools and heaters

Xtellio brings telematics to jobsite tools and heaters

Xtellio launched a two-tier telematics platform in March 2026: 32 battery-powered Xense sensors for small tools and wired Pro-Xentral devices for excavators, light towers and heaters. The company claims a 10-year battery life. Data is delivered through open APIs, which Xtellio frames as customer ownership of the data, aimed at rental and construction fleets where small assets have gone largely untracked.

  • 01Xtellio’s stated 10-year battery life for its Bluetooth Xense sensors is the key spec to test in the field; if it holds up, tagging hundreds of tools can look like a one-time install rather than a recurring battery-maintenance program.
  • 02For rental houses and contractors running mixed fleets, the sharper question is no longer which machines have telematics but whether the heaters, light towers and hand tools do, and whether that data lands in the same system.
  • 03Open APIs and “data liberation” are part of Xtellio’s pitch, and the coverage frames that as a prompt for RFP questions: what the APIs expose, where data can be sent, and whether customers can take historical data if they switch providers.

Sep 18, 2026

Senate bill would double smart water grants to $50 million a year

Senate bill would double smart water grants to $50 million a year

S. 2388, the Water Infrastructure Modernization Act of 2025, would double an EPA water tech pilot to $50 million a year through 2028. Grants would cover design, construction, training and operations for leak detection, advanced metering and AI analytics, WaterWorld reported. Planning and maintenance stay on the utility's tab.

  • 01Under S. 2388 as WaterWorld describes it, feasibility studies are not grant-eligible, so a utility would have to pay to build the case for a smart water project before applying for help building the project itself.
  • 02The bill's eligible list puts advanced digital design and construction management tools in the same bucket as meters and sensors, which would give a utility's capital delivery team a claim on the same grant as its field operations group.
  • 03The existing pilot program's authorization runs through 2026, per WaterWorld; the bill would extend it to 2028, and its last reported status was 'introduced' as of Aug. 12, 2025.

Sep 17, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512