GEODIS Unlocks Smarter Warehouse Operations Using CaseFlow Case Picking Solution

GEODIS, a global leader in logistics and distribution, has long relied on case and pallet picking as a core part of its warehouse operations. Seeking to reduce manual travel and improve fulfillment speed, the company implemented CaseFlow, Vecna Robotics’ intelligent case picking solution.

Andy Johnston, Senior Director of Design Engineering & Innovation, and Steve Elsbury, Senior Operations Manager at GEODIS, share the company’s experience deploying the system across its operations. The introduction of CaseFlow brought immediate benefits. Associates now receive orders directly at their location, eliminating the need for repeated travel to induction points. This shift has contributed to increased picking rates, improved productivity, and greater alignment with incentive-based pay structures.

The system is supported by Vecna Robotics’ Pivotal Command Center, which provides real-time remote assistance to floor operations. This capability has helped GEODIS maintain consistent performance and resolve issues quickly, reinforcing the operational value of CaseFlow in a high-volume environment. As a scalable solution for case picking, CaseFlow has enabled GEODIS to adapt quickly to changing workflows and product demands.

Recent Episodes

A rapidly changing HVAC industry is being shaped by refrigerant shortages, a deepening labor gap, and shifting expectations from homeowners. With refrigerant regulations evolving and long-trusted standards like R410A being phased out, contractors and technicians are navigating not only technical complexity, but also a growing need to rebuild trust and transparency with customers. The…

As careers become less linear and more purpose-driven, workers are increasingly drawn to environments that value adaptability, culture fit, and soft skills for career growth. These capabilities are proving just as critical as technical expertise, especially as AI, remote work, and flexible paths reshape the labor market. According to McKinsey, 70 percent of workers…

When a two-alarm fire broke out at a large hotel, swift action was critical to minimizing damage and disruption. BMS CAT responded in under 45 minutes, arriving on-site to assess the situation and begin stabilizing the property. This immediate response helped protect the building from further loss. That same night, the local BMS CAT…