Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Listen: Getting Wired, High-Def and Interactive at the Smithsonian with Jason Barak of D3 LED

One interesting characteristic that most historic buildings have in common: not a lot of electrical outlets, generally speaking. That makes introducing modern technology into these spaces, especially ones as revered and iconic as the Smithsonian… a challenge; even then, the electrical requirements are just a small part of the project. On today’s podcast, our…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share
Listen: Getting Wired, High-Def and Interactive at the Smithsonian with Jason Barak of D3 LED

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Start free

One interesting characteristic that most historic buildings have in common: not a lot of electrical outlets, generally speaking. That makes introducing modern technology into these spaces, especially ones as revered and iconic as the Smithsonian… a challenge; even then, the electrical requirements are just a small part of the project.

On today’s podcast, our host spoke with the Executive Vice President of Business Development for D3 LED, Jason Barak. They discussed the recent project D3 completed for the Smithsonian, called “The Gateway,” diving in to some of the challenges associated with implementing a new concept in an older edifice, how several early ideas didn’t make it off of the drawing board, and the moment that a visitor first experienced the final product. “It’s just one of the most unique user experiences I’ve ever seen,” Barak said.

Sean Heath: Today, I have the pleasure of having a conversation with my close personal friend, Jason Barak. He’s the Executive Vice-President of Business Development for D3 LED. Jason, my friend, how are you today?

Jason Barak: Hi. I’m doing great, Sean. Thanks for having me today.

SH: Hey, I have to say I’m thrilled I get a chance to talk to you because the last time we spoke, we didn’t have an opportunity to talk about a project you got to work on with the Smithsonian.

JB: It’s one of those projects that I could talk about for days. Literally, it just has so many interesting aspects of it, and the story of how it came together is just amazing.

SH: Well, let’s do sort of like a debrief or a postmortem, okay? Let’s start off with what was the challenge or what was the, I don’t want to say problem, but what was the opportunity that the Smithsonian was trying to address? Let’s start just on the first page. What was going on?

JB: So it actually started with the Smithsonian Channel who wanted to have a presence, a larger presence at the Smithsonian. And in the Visitors Center, which is in the Castle Building, they wanted to do something unique, something to really pull people in as they’re entering the Smithsonian for the first time and learning about what’s going on there.

Our partner, Potion Design, brought us in as they had this concept of putting together this interactive touch table with a giant LED wall, and it’s called “The Gateway”. Now, this building was built in 1849. So it had a lot of unique architecture and different aspects of it that needed our attention. So it was pretty cool how it came together working with the folks there at the Smithsonian, the Smithsonian Channel Team, and then also the folks over at Potion.

SH: Now, not a lot of wall outlets in a building built in the 1800s. So let’s leave the power supply challenge out of this because I’m really interested in the artistic approach that you took and just the sheer mechanical challenges that you had. How did that project turn into a project for D3? It seems like it would have been a natural progression, but what was the process?

JB: Yeah. So that’s a really good question, Sean, because with something like this, you are looking at so many different aspects of a project. It’s kind of what we term a D3 is, fit, form, and function. First, you look at the environment, an environment that’s already built from 1849. How do you fit the technology in there? And then form, what are you going to do, just grow something up against the wall or is it going to integrate a little bit with the architecture? Is it going to be LED, LCD? What’s it going to be? And then the function of it, not only what does it function, but how does it function.

So those three key areas were explored by both D3 and Potion putting together a feasibility study, and then some conceptual decks for both the channel and the institution to look at. So we were able to get through that process and finally got to a point where they decided that they wanted a large screen above this entryway, but then had these legs on either side that kind of came down so that people’s eyes could really focus on all aspects of the screen. It could really tell a very big story.

For the latest news, videos, and podcasts in the Pro AV Industry, be sure to subscribe to our industry publication.

Follow us on social media for the latest updates in B2B!

Twitter – @ProAVMKSL

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Engineering & Construction Insights

Packaging robots are now cheaper than labor over the long run, PMMI says

Packaging robots are now cheaper than labor over the long run, PMMI says

PMMI's Tom Egan wrote in Processing Magazine that adding packaging automation and robotics can now be justified as more cost-effective over the long term than the high cost of labor in food, beverage and CPG plants. Separately, Packaging World describes AI-enabled AMRs from ABB and Agilox that automate material movement between packaging stations. The remaining gap is adoption among smaller manufacturers.

  • 01Two reference points for infrastructure-light material movement: ABB's Flexley Mover P603 carries 1,500 kg with sub-centimeter positioning and no floor markers, and Agilox's OFL lifts 800 kg pallets on peer-to-peer fleet software with no central traffic controller, per Packaging World.
  • 02The open ground is small and mid-sized manufacturers: MTC's Mike Wilson counts tens of thousands of UK SMEs with no robotic automation at all and expects cobots to take most of that growth.
  • 03A robotics business case should include procurement, not only line labor: a June 2026 China Journal of Accounting Research study found heavy robot adopters spread buying across more suppliers, gaining resilience but losing inventory efficiency and adding transaction costs.

Sep 18, 2026

Xtellio brings telematics to jobsite tools and heaters

Xtellio brings telematics to jobsite tools and heaters

Xtellio launched a two-tier telematics platform in March 2026: 32 battery-powered Xense sensors for small tools and wired Pro-Xentral devices for excavators, light towers and heaters. The company claims a 10-year battery life. Data is delivered through open APIs, which Xtellio frames as customer ownership of the data, aimed at rental and construction fleets where small assets have gone largely untracked.

  • 01A 10-year battery claim on a bolt-on Bluetooth sensor is the benchmark to hold any small-asset telematics vendor against; it decides whether tagging hundreds of tools is a one-time job or a recurring maintenance chore.
  • 02For rental houses and contractors running mixed fleets, the sharper question is no longer which machines have telematics but whether the heaters, light towers and hand tools do, and whether that data lands in the same system.
  • 03Open APIs and customer-owned data are now part of the pitch from a telematics hardware maker, which gives buyers a concrete contract clause to ask for: where can the data be sent, and who controls it once the asset is on rent.

Sep 18, 2026

Senate bill would double smart water grants to $50 million a year

Senate bill would double smart water grants to $50 million a year

S. 2388, the Water Infrastructure Modernization Act of 2025, would double an EPA water tech pilot to $50 million a year through 2028. Grants would cover design, construction, training and operations for leak detection, advanced metering and AI analytics, WaterWorld reported. Planning and maintenance stay on the utility's tab.

  • 01Under S. 2388 as WaterWorld describes it, feasibility studies are not grant-eligible, so a utility would have to pay to build the case for a smart water project before applying for help building the project itself.
  • 02The bill's eligible list puts advanced digital design and construction management tools in the same bucket as meters and sensors, which would give a utility's capital delivery team a claim on the same grant as its field operations group.
  • 03The existing pilot program's authorization runs through 2026, per WaterWorld; the bill would extend it to 2028, and its last reported status was 'introduced' as of Aug. 12, 2025.

Sep 17, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512