Skip to content
‹ Back to IndustriesTransportation

New Rail Technology is Aiming to Revitalize More Rail Infrastructure as an Alternative to Trucking

Georgia is preparing to test an emerging system that could reshape how goods move by rail and compete directly with long-haul trucking

This story was produced through MarketScale. See how Transportation teams put it to work with Partner & Channel Enablement.

By Christopher Barkan · · Christopher BarkanInnovationRail InfrastructureRail Transportation
Share

Key takeaways

01

Georgia is preparing to test an emerging system that could reshape how goods move by rail and compete directly with long-haul trucking

Free workspace

Turn your Transportation expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Innovation in the world of rail infrastructure is often thought of as new train designs or faster speeds. But a paradigm shift is brewing in the way goods are transported across rails. Currently, Georgia wants to test that new technology. The emergence of technologies are reshaping the boundaries of what rail infrastructure can offer.

One particular system is designed to swiftly transport containers from busy ports and it presents a nimble alternative to traditional freight methods. Its essence lies not just in moving cargo efficiently, but also in its potential for dynamic train operations. While promising, the key question remains: can these systems integrate with conventional rail operations on busy lines? If the answer leans towards building a separate infrastructure, possibilities like utilizing interstate highway medians are intriguing. Today’s port congestion problems could soon see alleviation, but the vision for tomorrow seems even more revolutionary.

As the Executive Director of the Rail Transportation and Engineering Center at the University of Illinois at Urbana-Champaign, Christopher Barkan has vast experience and deep insights into rail systems and infrastructure. His perspective on innovative rail solutions sheds light on the advantages and challenges and considerations essential for the successful adoption of such technologies.

He shared a lot of thoughts regarding new technology and how that will impact port congestion, along with the trucking industry.

Barkan's Thoughts

Challenges and Opportunities of Integrating New Technology with Conventional Rail

“If this technology is going to be widely used for long distances, as opposed to the relatively short distance from the port to the inland port that I mentioned a few moments ago, either they’re going to have to build, somebody’s going to have to build a whole new set of infrastructure, or it’s going to have to integrate with conventional rail operations, again, freight or passenger.”

either they’re going to have to build, somebody’s going to have to build a whole new set of infrastructure, or it’s going to have to integrate with conventional rail operations, again, freight or passenger.
— Christopher Barkan, Executive Director of the Rail Transportation and Engineering Center at the University of Illinois at Urbana-Champaign

Vendor Landscape and System Differentiation

“The one you’re talking about, I believe, is the Parallel Systems. That’s one of the vendors that’s developing this technology. As I sent you, that links to at least two other systems that are not identical and they’re not even necessarily competitive. They’re aiming to do different things, but they’re part of this sort of new genre of trying to use rail infrastructure in fundamentally new ways, innovative ways for transportation of freight.”

The Specific Use-Case of Parallel Systems in Georgia

“So the basic, as I understand the Parallel Systems one, this one in, did you say it’s in Georgia? Is that where it is? Yeah. Their challenge there, and it’s not unique to that situation, is to get containers off of a ship and out of the port quickly.”

Autonomous Bogies for Quick Port Operations

“You unload a container off the ship and it gets onto one of these autonomous self-propelled bogies or a pair of bogies rather, I should say, and it may be multiple coupled together, virtually coupled together, and gets them out of the port right away or very quickly.”

Competition with Over-the-Road Trucks

“It’s also not really competitive with conventional freight rail, in my opinion. It’s much more competitive with over-the-road trucks, because again, we’re talking about one or two or three containers, which are going to be the size of a semi-trailer, but moving them together again without any drivers, potentially moving them much more quickly across a network than a conventional freight train might operate.”

It’s much more competitive with over-the-road trucks, because again, we’re talking about one or two or three containers, which are going to be the size of a semi-trailer, but moving them together again without any drivers, potentially moving them much more quickly across a network than a conventional freight train might operate.
— Christopher Barkan, Executive Director of the Rail Transportation and Engineering Center at the University of Illinois at Urbana-Champaign

On Versatility and Bulk Transport

“The other thing that makes it different from conventional freight trains is, it is the fact that it’s a container, and of course, the railroads move large volumes of both containers and trailers filled primarily with manufactured goods. Railroads also move huge quantities of what we call bulk commodities, such as grain, coal, chemicals, lumber, various other things like that, that really can’t be economically moved long distances by a truck.”

Interoperability with Conventional Rail

“I think my biggest question is, can this technology be integrated with conventional rail operation, whether it’s freight or passenger? This line that they’ve installed it in Georgia, there’s very little conventional traffic. I don’t know, maybe there’s one train a day. So it’s pretty easy to stay out of the way of the conventional traffic if they’re only running one or two trains a day.”

Future Possibilities and Infrastructure

“And one of the thoughts I’ve had about whether if they didn’t want to build new infrastructure, I think it’s plausible that interstate highway medians might be useful for this, because this technology is not going to be as sensitive to greater curvature as conventional freight or passenger railroads.”

The Role in a Broader Transportation Ecosystem

“As I say, I really don’t think it’s highly competitive with conventional freight railroads. It’s an extension, not a competitor. It could be used to leverage conventional freight. And again, to reiterate what I said earlier, this installation in Georgia is to alleviate port congestion, to basically make seaborne transport of containers, essentially improve the port side interface to get the ship in there, get the containers out, and get them where they’re going without causing a lot of congestion at the port and slowing things down.”

Future Implications and Dynamic Trains

“One of the nice things about this system is this idea of dynamic trains. You can start out with a train of 15 of these, and you come to a junction and five of them go one way and 10 of them go the other way. And then you could get to a section of industry where those 10 are further broken up to go to three or four different loading docks. So it’s got lots of potential, but the infrastructure for all of that does not exist yet. Pieces of it do, but a lot of it is missing, but maybe that’s where we’ll go in the future.”

Christopher Barkan is the Executive Director of the Rail Transportation and Engineering Center at the University of Illinois at Urbana-Champaign and has vast experience and deep insights into rail systems and infrastructure.

Your experts belong here

Every story in MarketScale Transportation starts with a company putting its fleet managers, logistics engineers, and safety leads on the record. Buyers are already reading this topic. The only question is whose experts they find.

Fleet and logistics buyers compare quietly, and your operators become the evidence that settles it.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

Christopher Barkan

Christopher P.L. Barkan is Professor and George Krambles Director of the Rail Transportation and Engineering Center (RailTEC) in the Department of Civil and Environmental Engineering at the University of Illinois at Urbana-Champaign. He received his B.A. (1977) from Goddard College and his M.S. (1984) and Ph.D. (1987) from the State University of New York at Albany. He held a postdoctoral fellowship at the Smithsonian Environmental Research Center before joining the Association of American Railroads (AAR) in 1988 where he worked for 10 years in the Research & Test and the Safety & Operations departments in Washington, D.C. He joined the faculty at the University of Illinois in 1998. Dr. Barkan teaches courses in railroad transportation engineering, railway signaling and operation, advances in rail technology and graduate seminars in various rail transportation topics. Since coming to the University of Illinois, he and his colleagues have expanded the rail curriculum from one course to ten, the largest of any North American university. He is also working with colleagues at other colleges and universities, leading efforts to expand rail transportation and engineering academic programs and opportunities nationwide.

B2B Weekly

The week in Transportation, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Transportation: are you visible to AI?

Before they reach out, Transportation buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Transportation expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your fleet managers, logistics engineers, and safety leads into the articles, video, and social content Transportation buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Transportation Insights

Photo-illustration of a refrigerated shipping container connected to shore power in a container yard.

Reefer risk at Mexican ports starts in the unplugged window

The riskiest reefer moment is the unplugged window after discharge. DCSA Track & Trace 3.0.0 offers a shared event format, but adoption in Mexico remains uncertain.

  • 01A terminal's installed plug count says how many reefers it can power; only occupancy, dwell times and the arrival schedule say how many it can take from the next vessel.
  • 02Truck appointment delays can tie up a reefer plug even when the container is properly powered, so inland pickup data belongs in yard capacity forecasts.
  • 03A practical test for partners: are Track & Trace 3.0.0 reefer events (power status, temperature, alarms) being shared so plug forecasts can be built?

Nov 23, 2026

Why electric yard tractors post 95 to 98% uptime in dedicated yards

Why electric yard tractors post 95 to 98% uptime in dedicated yards

Fleets running electric yard tractors posted 95 to 98% uptime in NACFE's report, and the tractors have done best in dedicated yards. That figure depends on predictable routes, charging windows and work. Site power often sets the schedule. Grid connections for fleet charging can take 36 months or longer, so Camber's Brendan Harney advises getting a power assessment from the utility before ordering tractors.

  • 01Electric yard tractors post 95 to 98% uptime in dedicated yards, a reliability benchmark that holds where routes, charging windows and workloads are predictable.
  • 02Grid connections for fleet charging can take 36 months or longer, so the utility's capacity date, not the tractor delivery date, is the realistic start of a yard electrification project.
  • 03Software-capped charging, such as 1.4 MW of chargers limited to a 1 MW grid draw, offers a way to start a first group of electric vehicles on existing service while an upgrade is pending.

Nov 22, 2026

Diagram links separate carrier and drayage chassis charges to one shipping container and one equipment timeline.

BlueCargo checks container charges against port records before anyone pays

BlueCargo audits container freight charges against both contract terms and an operational terminal record before invoices are paid. The bigger payoff can show up in carrier bids, where charge-level data on detention, demurrage and free time helps importers compare lanes beyond the rate card.

  • 01Two invoices can each pass a contract check and still bill the same chassis days twice; only tying both charges to one container's operational record exposes the overlap.
  • 02Shippers holding 16 to 20 days of negotiated free time may be paying for days they never use: in one analysis, fewer than 2% of a carrier's containers crossed a 12-day window, which supported trading four free days for $150 per container off the ocean rate.
  • 03When choosing an audit provider, ask what it is paid on: a share of recoveries rewards finding errors, while an invoice-compliance target (BlueCargo's is 95% correct on arrival) rewards fixing how carriers bill.

Nov 22, 2026

Explore More Transportation Insights

Read more expert perspectives from across Transportation.

Browse Transportation Hub

About the Expert

Christopher P.L. Barkan is Professor and George Krambles Director of the Rail Transportation and Engineering Center (RailTEC) in the Department of Civil and Environmental Engineering at the University of Illinois at Urbana-Champaign. He received his B.A. (1977) from Goddard College and his M.S. (1984) and Ph.D. (1987) from the State University of New York at Albany. He held a postdoctoral fellowship at the Smithsonian Environmental Research Center before joining the Association of American Railroads (AAR) in 1988 where he worked for 10 years in the Research & Test and the Safety & Operations departments in Washington, D.C. He joined the faculty at the University of Illinois in 1998. Dr. Barkan teaches courses in railroad transportation engineering, railway signaling and operation, advances in rail technology and graduate seminars in various rail transportation topics. Since coming to the University of Illinois, he and his colleagues have expanded the rail curriculum from one course to ten, the largest of any North American university. He is also working with colleagues at other colleges and universities, leading efforts to expand rail transportation and engineering academic programs and opportunities nationwide.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Transportation and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512