Skip to content
‹ Back to IndustriesEngineering & Construction

The Latest Addition to McDonald’s Has Nothing To Do With Its Menu: Why That’s A Good Thing

McDonald’s recently opened a new kind of restaurant in Chicago, and it’s drawing interest for something other than its famous fare. In addition to the standard menu, the corporation is serving up a new concept: sustainability. The new building itself is constructed of steel and wood timber, surrounded by over 70 trees and drought-tolerant plants….

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
The Latest Addition to McDonald’s Has Nothing To Do With Its Menu: Why That’s A Good Thing

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

McDonald’s recently opened a new kind of restaurant in Chicago, and it’s drawing interest for something other than its famous fare. In addition to the standard menu, the corporation is serving up a new concept: sustainability.

The new building itself is constructed of steel and wood timber, surrounded by over 70 trees and drought-tolerant plants. Its roof is also covered by natural vegetation. The location is part of the company’s Experience of the Future Campaign, an initiative toward meeting contemporary consumer expectations, and ecological soundness is high on that list.

Other features include exterior permeable pavers, which reduce runoff and filter pollutants, LED lighting inside and out, and a kitchen equipped with high energy-efficiency appliances. The company has announced a goal to have all freestanding locations transformed similarly by 2020. As huge as this undertaking appears, it is only a portion of the company’s plan to become totally green. Earlier this year, McDonald’s announced its intention to have 100 percent of its customer packaging generated from renewable, recycled, or certified sources and have recycling available in all its restaurant locations.

McDonald’s isn’t the only fast food chain concerned with the environment. Wendy’s, as part of its participation in the Department of Energy’s Better Buildings Challenge, has reported a 12 percent reduction in energy usage already, with a goal of 20 percent by 2025. Chipotle re-houses its used equipment and furniture by donating to other restaurants, keeping landfills cleaner, and it requests its shipments with minimal padding to reduce cardboard usage and waste. And Yum! Brands, which owns Taco Bell, KFC, and Pizza Hut, has constructed 30 LEED-certified buildings around the world, with plans to gradually incorporate similar green efforts in all of its locations.

As far as food waste goes, the outlook for earth is good—a 2018 report by the National Restaurant Association revealed that “reducing food waste is emerging as a key activity for [restaurant] operators.”

Reactions from leadership in environmental groups has been highly positive.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

North Texas Data Centers Boom, Mechanical Trades Constrain

North Texas Data Centers Boom, Mechanical Trades Constrain

Mechanical trades now shape liquid-cooled data center schedules

  • 01DFW data center construction faces mechanical workforce constraints
  • 02Mechanical trades are crucial for data center deployment timelines.

Nov 2, 2026

Brock's 3D scaffold model replaced 1,400+ standby hours with <25

Brock's 3D scaffold model replaced 1,400+ standby hours with <25

Brock Group executives Enrique Zavala and Brent Roscoe argue scaffolding belongs in the BIM model from the start of an industrial project. BIC Magazine reports one Brock 3D model replaced more than 1,400 budgeted standby hours with under 25 hours of rework. Peer-reviewed studies support BIM-based planning and forecasting, while noting scaffold modeling and laser scanning still demand specialized skills.

  • 01On one three-month project, BIC Magazine reports, a Brock 3D scaffold model left one minor field change and under 25 labor hours of rework against more than 1,400 budgeted standby hours.
  • 02A 2017 IAARC paper found scaffolding is usually left out of the BIM model, and a June 2024 MDPI case study found scan-to-BIM needs specialized equipment and skills, so the gains are not automatic.

Nov 2, 2026

CivDot robots shift surveyors to control and spot checks

CivDot robots shift surveyors to control and spot checks

On robotic layout jobs, the surveyor's work shifts to setting control and spot-checking the machine's marks.

  • 01On robotic layout jobs, the surveyor keeps the control network and the spot checks, the two tasks that decide whether thousands of machine-set marks are right.
  • 02Autonomy is most advanced offshore and underground, where work is risky and costly; routine low-risk jobs are adopting it more slowly.

Nov 1, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512