Skip to content
‹ Back to IndustriesEngineering & Construction

Improving HVAC Systems Plays a Key Role for Meeting Building Efficiency Goals

Optimizing HVAC systems represents one of the largest opportunities for reducing global energy consumption and meeting building efficiency targets. Improved climate control technologies and practices could unlock trillions of dollars in annual savings across commercial and residential sectors. The article highlights HVAC modernization as a critical lever for sustainability and operational cost reduction.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Straight Outta Crumpton on MarketScale.

By Greg Crumpton · · Building EfficiencyEmissions GoalsEnergy EfficiencyGreg Crumpton
Share

Key takeaways

01

HVAC optimization could unlock trillions in annual energy savings globally.

02

Building efficiency goals are increasingly dependent on modernizing climate control systems.

03

Reducing energy consumption through HVAC improvements has significant environmental and financial benefits.

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

In today’s rapidly advancing world, the role of HVAC systems for building efficiency goals has become a pivotal topic for businesses and property owners alike. With energy costs soaring, the shift towards more energy-efficient systems isn’t just a luxury—it’s a financial imperative.

Building efficiency upgrades could slash global energy demand by 12% and save up to $2 trillion annually by 2030.

Building efficiency upgrades could slash global energy demand by 12% and save up to $2 trillion annually by 2030, according to recent WEF international reports. By focusing on existing buildings which will largely remain in use through 2050, these enhancements, driven by technologies like efficient HVAC and LED lighting, aim to reduce building energy intensity by 38% by 2050.

With so many incentives pushing building managers to look to HVAC systems for building efficiency goals, what are some of the top considerations facilities should make as they approach investments in new HVAC systems?

Greg Crumpton, a skilled trades zealot and HVAC industry executive as VP of commercial HVAC and mechanical services leader Service Logic, explains the suite of powerful options with modern HVAC technologies, explaining how today’s top systems offer not only reduced energy consumption to meet building efficiency goals but also enhanced control systems and better warranties.

“Consider the refrigerant that is in your older system. It may be one of the gases that are being phased out. You may want to consider new equipment simply because the old refrigerant is going to be much more expensive to buy should you have a leak or have to make a repair,” Crumpton said.

You may want to consider new equipment simply because the old refrigerant is going to be much more expensive to buy should you have a leak or have to make a repair.
— Greg Crumpton, VP of Commercial HVAC and Mechanical Services at Service Logic

Straight Outta Crumpton

Part of this channel

Straight Outta Crumpton

Greg Crumpton on why relationships are the foundation of business

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

Greg Crumpton
Greg CrumptonVice President

Straight Outta Crumpton Greg's personal & professional goals are to serve the people that he am working with and/or for. He carries this mantra in his professional life and his home life. Having 40+ years as a full-service mechanical and mission critical environments contractor with a heavy emphasis on service, maintenance and repair. Greg specialize in mission critical cooling (Heat Rejection) and electrical infrastructures, as well as the comfort cooling surrounding them. As a continual entrepreneur, several markets strike him as interesting. As varied as you could imagine, they range from Coffee with my bud's at www.CommonPlaceCoffee.com, all the way to serving as an adviser for several start-ups in the emerging technology world via www.aGlobalVenture.com & www.AtomPower.com and others. Giving back to his community is of equal importance to him, www.apparo.org and Animal Welfare are just a couple ways of doing just that.

B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

How Kaufmann fits a timber module factory into six trucks

How Kaufmann fits a timber module factory into six trucks

Kaufmann Bausysteme sets up timber module production in rented industrial halls near large projects, moving its equipment in six trucks within three weeks. The Austrian builder's rail-fed line delivers about one module an hour at up to 95% prefabrication. Kaufmann now wants to license that process abroad, charging per module.

  • 01For large timber-module runs, Kaufmann avoids long-distance shipping of finished modules by moving its production setup instead: the equipment fits in six trucks, production can start in a rented hall within three weeks, and the setup can be dismantled within a week.
  • 02The portable part is the documented process. Prescribed workstation tasks, a QR code per module and photo records at each stage let a newly trained local crew turn out the same module in a rented hall.
  • 03A per-module licence fee is the milestone to watch: Kaufmann is exploring a franchise model, and if the Montana support or New Zealand enquiries become a signed licence, its manufacturing playbook and digital system could become something other builders license and pay for per module.

Nov 28, 2026

Global I-joist market $2.6B in 2024, mass timber $990.4M

Global I-joist market $2.6B in 2024, mass timber $990.4M

RedBuilt’s November releases cite a $2.6 billion global I-joist market in 2024 and a $990.4 million global mass timber construction market in 2024, though the article notes the figures may reflect different scopes. The mass timber release highlights hybrid systems pairing timber with LVL, I-joists, open-web trusses and glulam. RedBuilt also urges teams to involve the engineered wood supplier at schematic design, when key structural choices get set.

  • 01Market figures for wood construction cover very different scopes, from $990.4 million for mass timber to a $44.2 billion timber construction forecast for 2035. Check which definition a number uses before it goes into a business case.
  • 02Wood framing can run 15-20% cheaper than steel at the shell level, but only when span, insurance and how long the owner holds the building line up. Truss and joist depth also sets ceiling heights and duct routing, so the comparison has to happen before construction documents start.

Nov 28, 2026

Only 1 in 15 Mexico data center projects clears Fibra Mty's due diligence

Only 1 in 15 Mexico hyperscale projects wins Fibra Mty sign-off

Fibra Mty reviews roughly 15 potential hyperscale data center projects in Mexico and typically signs off on one. Panelists said CFE/CENACE interconnections can take three to four years, so developers need a verifiable path to power—along with permits and water—before hyperscalers will sign build-to-suit deals.

  • 01With grid connections in Mexico taking three to four years, the power path sets a data center's calendar before construction starts, and Fibra Mty passes only about 1 in 15 hyperscale projects it reviews.
  • 02Queretaro holds 72% of Mexico's active data center megawatts; Monterrey, Saltillo, Guanajuato and Jalisco work as alternatives only where transmission capacity and environmental permits check out site by site.
  • 03A sharper BTS-bid question: with roughly 42-week waits for transformers and switchgear, are long-lead power orders aligned to the same energization date as the grid connection?

Nov 27, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Expert

Greg Crumpton, host of Straight Outta Crumpton
Greg Crumpton

Host, Straight Outta Crumpton

Greg Crumpton is a facilities and HVAC industry veteran with decades of experience in building systems, maintenance, and workforce development. He hosts the podcast 'Straight Outta Crumpton,' which focuses on the skilled trades and facilities management sector. Crumpton is recognized as a thought leader on building efficiency and the future of facility operations.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512